HTME

COURSE OVERVIEW

PE0531 : Flare, Blowdown & Pressure Relief Systems
Flare, Blowdown & Pressure Relief Systems
OVERVIEW
COURSE TITLE:PE0531 : Flare, Blowdown & Pressure Relief Systems
COURSE DATE:Jan 21 - Jan 25 2024
DURATION:5 Days
INSTRUCTOR:Mr. Abdul Ghani Anadani
VENUE:Doha, Qatar
COURSE FEE:$ 6000
Request For Course Outline
OTHER SCHEDULED DATES
Date : Jan 14 - Jan 18 (5 Days) Location : Istanbul, Turkey Classroom Fee (US$) : $ 6000 Course Info
Date : Feb 18 - Feb 22 (5 Days) Location : Dubai, UAE Classroom Fee (US$) : $ 5500 Course Info
Date : Mar 03 - Mar 07 (5 Days) Location : Istanbul, Turkey Classroom Fee (US$) : $ 6000 Course Info
Date : May 05 - May 09 (5 Days) Location : Istanbul, Turkey Classroom Fee (US$) : $ 6000 Course Info
Date : Aug 04 - Aug 08 (5 Days) Location : Doha, Qatar Classroom Fee (US$) : $ 6000 Course Info
Date : Oct 13 - Oct 17 (5 Days) Location : Dubai, UAE Classroom Fee (US$) : $ 5500 Course Info
Date : Oct 20 - Oct 24 (5 Days) Location : Istanbul, Turkey Classroom Fee (US$) : $ 6000 Course Info
Date : Dec 08 - Dec 12 (5 Days) Location : Dubai, UAE Classroom Fee (US$) : $ 5500 Course Info

Course Description

This practical and highly-interactive course includes various practical sessions and exercises. Theory learnt will be applied using our state-of-the-art simulators. The flare, blowdown and pressure relief systems are the most important elements for emergency and operational discharge of flammable substances in the process facilities. Safety relief and flare systems control vapour?s and liquids that are released by pressure-relieving devices and blow-downs. Pressure relief is an automatic, planned release when operating pressure reaches a predetermined level. Blowdown normally refers to the intentional release of material, such as blowdowns from process unit start-ups, furnace blowdowns, shutdowns, and emergencies. Vapor depressuring is the rapid removal of vapour?s from pressure vessels in case of fire. This may be accomplished by the use of a rupture disc, usually set at a higher pressure than the relief valve. The principal elements of the safety relief and flare systems are the individual pressure relief devices, the flare piping system, the flare separator drum, and the flare (including igniters, tips, sealing devices, purge and steam injection for smokeless burning). Application of relief devices must comply with appropriate ASME Vessel Codes and API 520/521 standards.Design of relief devices must comply with applicable national codes and laws as well as the requirements of the insurance covering the plant or installation. National regulations not only cover safety but also environmental considerations such as air and water pollution and noise abatement. This course presents a convenient overview of relief system details based on the full scope of API, ASME, and other code and specification requirements. It covers all aspects of relief flare systems from the emergency relief sources through the valving and flare network right to the stack and flare tip. Descriptions and design criteria will be outlined for flare tips, seals, stacks, knockout drums, header systems, relief valves, depressurization systems and basic hazard analysis. Alternative design methods will be also described with reference to the specific nature of relief and flare systems worldwide.

link to course overview PDF

TRAINING METHODOLOGY

This interactive training course includes the following training methodologies:

Lectures
Workshops & Work Presentations
Case Studies & Practical Exercises
Videos, Software & Simulators

In an unlikely event, the course instructor may modify the above training methodology for technical reasons.

VIRTUAL TRAINING (IF APPLICABLE)

If this course is delivered online as a Virtual Training, the following limitations will be applicable:

Certificates:Only soft copy certificates will be issued
Training Materials:Only soft copy materials will be issued
Training Methodology:80% theory, 20% practical
Training Program:4 hours per day, from 09:30 to 13:30

RELATED COURSES

Catalyst Selection & Production Optimization

PE0120 : Catalyst Selection & Production Optimization

Flare, Blowdown & Pressure Relief Systems

PE0531 : Flare, Blowdown & Pressure Relief Systems

Safe Process Units Start-Up/Shutdown and Development of Equipment Handling Over/Commissioning Procedures

PE0230K1 : Safe Process Units Start-Up/Shutdown and Development of Equipment Handling Over/Commissioning Procedures

Root Cause Analysis (RCA) of Upset in Process Plant

PE0922 : Root Cause Analysis (RCA) of Upset in Process Plant