" " " "
HTME

COURSE OVERVIEW

DE1095 : Wellhead Operations Specialist: Wellhead System Maintenance & Safety

Wellhead Operations Specialist: Wellhead System Maintenance & Safety
OVERVIEW
COURSE TITLE : DE1095 : Wellhead Operations Specialist: Wellhead System Maintenance & Safety
COURSE DATE : Aug 30 - Sep 03 2026
DURATION : 5 Days
INSTRUCTOR : Dr. Chris Kapetan
VENUE : Doha, Qatar
COURSE FEE : $ 8500
Register For Course

Course Description

This practical and highly-interactive course includes various practical sessions and exercises. Theory learnt will be applied using our state-of-the-art simulators.

This course is designed to provide participants with a detailed and up-to-date overview of Wellhead Operations Specialist: Wellhead System Maintenance and Safety. It covers the purpose and role of the wellhead, wellhead types, basic components of a wellhead and interface with casing and tubing; the wellhead system components, types of wellheads and applications and wellhead pressure control equipment; the materials and design standards, safety requirements and industry best practices; the wellhead installation procedures and pressure testing techniques; the inspection and integrity assessment, sealing systems and gasket maintenance; and the bolt torqueing and tensioning practices.

Further, the course will also discuss the recording maintenance and inspection results; the API and operator documentation standards, inspection checklist preparation, reporting anomalies and corrective actions; the routine preventive maintenance, valve maintenance procedures and corrosion control and protection; the grease injection systems and wellhead accessories maintenance; and troubleshooting common wellhead issues and the safety hazards and risk assessment. 

During this interactive course, participants will learn the procedures for isolating wellhead equipment, lockout/tagout requirements, verification of zero-energy state and documentation and control; the emergency shutdown systems, blowout prevention and response; the fire protection around wellhead installations and incident reporting and investigation; the wellhead maintenance planning, wellhead system upgrades and modifications and interface with other oilfield systems; monitoring wellhead pressures and trends; the data acquisition systems and predictive maintenance approaches; and the interpretation of condition monitoring data. 

TRAINING METHODOLOGY

This interactive training course includes the following training methodologies:

Lectures
Practical Workshops & Work Presentations
Hands-on Practical Exercises & Case Studies
Simulators (Hardware & Software) & Videos

In an unlikely event, the course instructor may modify the above training methodology for technical reasons.

VIRTUAL TRAINING (IF APPLICABLE)

If this course is delivered online as a Virtual Training, the following limitations will be applicable:

Certificates : Only soft copy certificates will be issued
Training Materials : Only soft copy materials will be issued
Training Methodology : 80% theory, 20% practical
Training Program : 4 hours per day, from 09:30 to 13:30

OTHER SCHEDULED DATES
Refrence Date Location Instructor Fee (USD) Outline Actions
DE1095 May 10 - May 14 2026 (5 Days) Istanbul, Turkey Dr. Chris Kapetan $ 8,500 N/A
DE1095 Jul 06 - Jul 10 2026 (5 Days) Seville, Spain Dr. Chris Kapetan $ 8,800 N/A
DE1095 Sep 21 - Sep 25 2026 (5 Days) Cairo, Egypt Dr. Chris Kapetan $ 8,000 N/A
DE1095 Nov 06 - Nov 20 2026 (15 Days) London, United Kingdom Dr. Chris Kapetan $ 8,800 N/A
DE1095 Dec 13 - Dec 17 2026 (5 Days) Dubai, UAE Dr. Chris Kapetan $ 8,000 N/A
DE1095 Jan 03 - Jan 07 2027 (5 Days) Doha, Qatar Dr. Chris Kapetan $ 8,500 N/A
DE1095 Feb 07 - Feb 11 2027 (5 Days) Dubai, UAE Dr. Chris Kapetan $ 8,000 N/A
DE1095 Mar 14 - Mar 18 2027 (5 Days) London, United Kingdom Dr. Chris Kapetan $ 8,800 N/A

RELATED COURSES

Trouble-Free Drilling (Stuck Pipe Prevention)

DE0970 : Trouble-Free Drilling (Stuck Pipe Prevention)

Well Composite, Construction Integrity & Completion

DE0960 : Well Composite, Construction Integrity & Completion

Petroleum Project Economics & Risk Analysis

DE0923 : Petroleum Project Economics & Risk Analysis

Integration of Core & Log Data

DE0009(KP4) : Integration of Core & Log Data