" " " "
HTME

COURSE OVERVIEW

DE0867(SI7) : Cased Hole and Production Log Evaluation

Cased Hole and Production Log Evaluation
OVERVIEW
COURSE TITLE : DE0867(SI7) : Cased Hole and Production Log Evaluation
COURSE DATE : Jun 21 - Jun 25 2026
DURATION : 5 Days
INSTRUCTOR : Mr. Ron Guney
VENUE : London, United Kingdom
COURSE FEE : $ 8800
Register For Course

Course Description

This practical and highly-interactive course includes real-life case studies and exercises where participants will be engaged in a series of interactive small groups and class workshops.
Water identification and fluid and fluid movement in both injection and producing wells are evaluated using spinners, tracers, pulsed neutron oxygen activation, temperature and noise survey. A variety of fluid identification devices are used to evaluate multiphase flow. These tools together are used to quantify the sources water, oil, gas production and are critical to the control of excessive water or other phases. Videos of and in vertical, deviated and horizontal flows are used to aid in visualization of the logging environment.
This course is designed to provide delegates with detailed and up-to-date overview of applied production logging and cased hole & production log evaluation. It covers oil and gas entries from flowmeter/fluid ID and temperature surveys, fluid movement in both injection and producing wells using spinners, tracers, pulsed neutron oxygen activation, temperature and noise survey as well as detecting movement inside/outside of pipe using oxygen activation.
The course will discuss heavy phase “fallback” in flows and select tools to minimize its effect including the various tools used to quantify the sources of water, oil gas production that are critical to the control of excessive water or other phases and the various problems of highly deviated/horizontal well.
Computation of fluid saturations from pulsed neutron (Sigma and C/O) measurements and evaluation of water, oil and gas entry profiles from flowmeter/fluid ID and temperature will also be discussed during the course.

TRAINING METHODOLOGY

This interactive training course includes the following training methodologies:

Lectures
Practical Workshops & Work Presentations
Hands-on Practical Exercises & Case Studies
Simulators (Hardware & Software) & Videos

In an unlikely event, the course instructor may modify the above training methodology for technical reasons.

VIRTUAL TRAINING (IF APPLICABLE)

If this course is delivered online as a Virtual Training, the following limitations will be applicable:

Certificates : Only soft copy certificates will be issued
Training Materials : Only soft copy materials will be issued
Training Methodology : 80% theory, 20% practical
Training Program : 4 hours per day, from 09:30 to 13:30

OTHER SCHEDULED DATES
Refrence Date Location Instructor Fee (USD) Outline Actions
DE0867(SI7) Apr 26 - Apr 30 2026 (5 Days) Istanbul, Turkey Mr. Ron Guney $ 8,500 N/A
DE0867(SI7) Jul 19 - Jul 23 2026 (5 Days) Doha, Qatar Mr. Ron Guney $ 8,500 Outline
DE0867(SI7) Aug 17 - Aug 21 2026 (5 Days) Seville, Spain Mr. Ron Guney $ 8,800 N/A
DE0867(SI7) Sep 20 - Sep 24 2026 (5 Days) Dubai, UAE Mr. Ron Guney $ 8,000 N/A
DE0867(SI7) Nov 22 - Nov 26 2026 (5 Days) Cairo, Egypt Mr. Ron Guney $ 8,000 N/A
DE0867(SI7) Dec 20 - Dec 24 2026 (5 Days) Doha, Qatar Mr. Ron Guney $ 8,500 Outline
DE0867(SI7) Jan 10 - Jan 14 2027 (5 Days) Dubai, UAE Mr. Ron Guney $ 8,000 N/A
DE0867(SI7) Feb 07 - Feb 11 2027 (5 Days) Doha, Qatar Mr. Ron Guney $ 8,500 N/A
DE0867(SI7) Mar 22 - Mar 26 2027 (5 Days) London, United Kingdom Mr. Ron Guney $ 8,800 N/A

RELATED COURSES

Integration of Core & Log Data

DE0009(KP4) : Integration of Core & Log Data

Trouble-Free Drilling (Stuck Pipe Prevention)

DE0970 : Trouble-Free Drilling (Stuck Pipe Prevention)

Well Composite, Construction Integrity & Completion

DE0960 : Well Composite, Construction Integrity & Completion

Petroleum Project Economics & Risk Analysis

DE0923 : Petroleum Project Economics & Risk Analysis