COURSE OVERVIEW
DE0831 : Advanced Drilling, Completion and Workovers Technology
OVERVIEW
| COURSE TITLE | : | DE0831 : Advanced Drilling, Completion and Workovers Technology |
| COURSE DATE | : | Dec 27 - Dec 31 2026 |
| DURATION | : | 5 Days |
| INSTRUCTOR | : | Mr. Dimitri Massaras |
| VENUE | : | Cairo, Egypt |
| COURSE FEE | : | $ 8000 |
| Register For Course | ||
Course Description
This practical and highly-interactive course includes real-life case studies and exercises where participants will be engaged in a series of interactive small groups and class workshops. The profitability of a well as an investment venture depends on how long it is on stream and how much it produces. Its lifetime and output are naturally due to the reservoir?s initial characteristics. However, they are also dependent on keeping the well maintained in good working order and adapting completion properly to the constantly varying conditions prevailing in the reservoir and around the wellbore. The operations that may have to be carried out on a well are numerous and can be broken down into measurements, maintenance and workover. Working on a well to reclaim or increase oil and gas production is a formidable segment of today?s petroleum industry. This was not always the case, however, and many factors have changed the position of the workover industry from a minor to a major role. Foremost of these factors is that petroleum demand continues to grow, while reserves continue to decline. This difference has to be made up with existing wells, which means reworking off-production wells.During this interactive course, participants will learn the origin of pore pressure; the drilling problems associated with abnormal pressure; the optimization of bit hydraulics, casing design process, single and multiple stage cementing; the trajectory for a directional wells; the directional drilling tools and BHA, directional surveying tools and the main factors influencing completion design; the overall approach to a well?s flow capacity; the major types of completion configurations and the main phases in completion; the cement job, perforating and treating the pay zone; the general configuration of flowing well equipment, the production wellhead, the production string or tubing and packers; the down hole equipment, subsurface safety valves and running procedure; the run procedures, artificial lift process and down hole equipment for smart completion; the main types off well servicing and workover; the servicing & workover special cases; and the carbonate acidizing, sandstone acidizing, scales and paraffin removal and squeeze cementing.
TRAINING METHODOLOGY
This interactive training course includes the following training methodologies:
LecturesPractical Workshops & Work Presentations
Hands-on Practical Exercises & Case Studies
Simulators (Hardware & Software) & Videos
In an unlikely event, the course instructor may modify the above training methodology for technical reasons.
VIRTUAL TRAINING (IF APPLICABLE)
If this course is delivered online as a Virtual Training, the following limitations will be applicable:
| Certificates | : | Only soft copy certificates will be issued |
| Training Materials | : | Only soft copy materials will be issued |
| Training Methodology | : | 80% theory, 20% practical |
| Training Program | : | 4 hours per day, from 09:30 to 13:30 |
| Refrence | Date | Location | Instructor | Fee (USD) | Outline | Actions |
|---|---|---|---|---|---|---|
| DE0831 | May 04 - May 08 2026 (5 Days) | Seville, Spain | Mr. Dimitri Massaras | $ 8,800 | N/A | |
| DE0831 | May 31 - Jun 04 2026 (5 Days) | Doha, Qatar | Mr. Dimitri Massaras | $ 8,500 | Outline | |
| DE0831 | Jun 08 - Jun 12 2026 (5 Days) | London, United Kingdom | Mr. Dimitri Massaras | $ 8,800 | N/A | |
| DE0831 | Jul 26 - Jul 30 2026 (5 Days) | Istanbul, Turkey | Mr. Dimitri Massaras | $ 8,500 | N/A | |
| DE0831 | Sep 27 - Oct 01 2026 (5 Days) | Dubai, UAE | Mr. Dimitri Massaras | $ 8,000 | N/A | |
| DE0831 | Nov 08 - Nov 12 2026 (5 Days) | Doha, Qatar | Mr. Dimitri Massaras | $ 8,500 | Outline | |
| DE0831 | Jan 10 - Jan 14 2027 (5 Days) | Doha, Qatar | Mr. Dimitri Massaras | $ 8,500 | N/A | |
| DE0831 | Mar 14 - Mar 18 2027 (5 Days) | Dubai, UAE | Mr. Dimitri Massaras | $ 8,000 | N/A |
RELATED COURSES
DE0009(KP4) : Integration of Core & Log Data
- Date: Feb 01 - Feb 05 / 3 Days
- Location: Doha, Qatar
- Course Details Register
DE0923 : Petroleum Project Economics & Risk Analysis
- Date: Feb 01 - Feb 05 / 3 Days
- Location: Dubai, UAE
- Course Details Register
DE0960 : Well Composite, Construction Integrity & Completion
- Date: Feb 01 - Feb 05 / 3 Days
- Location: Cairo, Egypt
- Course Details Register
DE0970 : Trouble-Free Drilling (Stuck Pipe Prevention)
- Date: Feb 01 - Feb 05 / 3 Days
- Location: Doha, Qatar
- Course Details Register