" " " "
HTME

COURSE OVERVIEW

DE0159 : Horizontal and Multilateral Wells: Completions and Stimulation

Horizontal and Multilateral Wells: Completions and Stimulation
OVERVIEW
COURSE TITLE : DE0159 : Horizontal and Multilateral Wells: Completions and Stimulation
COURSE DATE : Jan 03 - Jan 07 2027
DURATION : 5 Days
INSTRUCTOR : Dr. John Petrus
VENUE : Doha, Qatar
COURSE FEE : $ 8500
Register For Course

Course Description

This practical and highly-interactive course includes real-life case studies and exercises where participants will be engaged in a series of interactive small groups and class workshops. Recent Advances in drilling and completion have resulted in a rapid increase in the number of horizontal and multilateral wells drilled each year around the world. A horizontal well, to some extent, is different from a vertical well because it requires an interdisciplinary interaction between various professionals, such as geologists, reservoir engineers, drilling engineers, production engineers, and completion engineers. A typical horizontal well project is different from a vertical well project because productivity of a well depends upon the well length. Moreover, the well length depends upon the drilling and completion techniques implemented. Multilateral well technology is revolutionizing the way that reservoirs are accessed by wells. The ability to create wells with multiple branches that can target widely spaced reservoir compartments provides engineers unlimited options in optimizing economic extraction of oil and gas. Along with this opportunity comes the inherent complexity of these well architectures.The course also analyzes the successes and failures of well integrity management from a series of real case studies in the oilfield and production facilities around the globe. During the course, the participants will review and discuss the requirements of operators and regulatory authorities for integrity assurance in wells and production facilities. They will also gain knowledge in the completion techniques and design of wells in increasingly complex field developments to ensure well integrity, failure-free and long-life production.

TRAINING METHODOLOGY

This interactive training course includes the following training methodologies:

Lectures
Practical Workshops & Work Presentations
Hands-on Practical Exercises & Case Studies
Simulators (Hardware & Software) & Videos

In an unlikely event, the course instructor may modify the above training methodology for technical reasons.

VIRTUAL TRAINING (IF APPLICABLE)

If this course is delivered online as a Virtual Training, the following limitations will be applicable:

Certificates : Only soft copy certificates will be issued
Training Materials : Only soft copy materials will be issued
Training Methodology : 80% theory, 20% practical
Training Program : 4 hours per day, from 09:30 to 13:30

OTHER SCHEDULED DATES
Refrence Date Location Instructor Fee (USD) Outline Actions
DE0159 Feb 01 - Feb 05 2026 (5 Days) Doha, Qatar Dr. John Petrus $ 8,500 Outline
DE0159 May 04 - May 08 2026 (5 Days) London, United Kingdom Dr. John Petrus $ 8,800 N/A
DE0159 Jul 12 - Jul 16 2026 (5 Days) Cairo, Egypt Dr. John Petrus $ 8,000 N/A
DE0159 Aug 30 - Aug 03 2026 (-26 Days) Doha, Qatar Dr. John Petrus $ 8,500 Outline
DE0159 Aug 30 - Sep 03 2026 (5 Days) Doha, Qatar Dr. John Petrus $ 8,500 N/A
DE0159 Oct 11 - Oct 15 2026 (5 Days) Dubai, UAE Dr. John Petrus $ 8,000 N/A
DE0159 Nov 01 - Nov 05 2026 (5 Days) Istanbul, Turkey Dr. John Petrus $ 8,500 N/A
DE0159 Dec 14 - Dec 18 2026 (5 Days) Seville, Spain Dr. John Petrus $ 8,800 N/A
DE0159 Feb 21 - Feb 25 2027 (5 Days) London, United Kingdom Dr. John Petrus $ 8,800 N/A
DE0159 Mar 14 - Mar 18 2027 (5 Days) Dubai, UAE Dr. John Petrus $ 8,000 N/A

RELATED COURSES

Petroleum Project Economics & Risk Analysis

DE0923 : Petroleum Project Economics & Risk Analysis

Well Composite, Construction Integrity & Completion

DE0960 : Well Composite, Construction Integrity & Completion

Trouble-Free Drilling (Stuck Pipe Prevention)

DE0970 : Trouble-Free Drilling (Stuck Pipe Prevention)

Integration of Core & Log Data

DE0009(KP4) : Integration of Core & Log Data