COURSE OVERVIEW
DE0815 : Waterflood Management

OVERVIEW
COURSE TITLE | : | DE0815 : Waterflood Management |
COURSE DATE | : | May 18 - May 22 2025 |
DURATION | : | 5 Days |
INSTRUCTOR | : | Mr. Konstantin Zorbalas |
VENUE | : | Dubai, UAE |
COURSE FEE | : | $ 8000 |
Register For Course Outline |
Course Description
This practical and highly-interactive course includes various practical sessions and exercises. Theory learnt will be applied using our state-of-the-art simulators.
The objective of oil producing companies is to maximize oil recovery from any given reservoir. To achieve the stated objective, the reservoir engineers do not rely only on primary (natural) energy, but also on artificial energy which gives rise to what we call secondary and tertiary methods of oil recovery.
Water flooding is one of the secondary methods of oil recovery. It involves injecting clean, non-corrosive water into the reservoir to displace the remaining oil. This course is primarily on the mechanics of oil recovery by water flooding.
The aim of this course is to provide the participants with a complete and up-to-date overview of the area of Water Flooding. Upon the successful completion of this course, the participant should have a solid grounding in the understanding of the purpose, operation and inspection of water injection systems for enhanced oil recovery. The course will illustrate potential problems and their resolution.
TRAINING METHODOLOGY
This interactive training course includes the following training methodologies:
LecturesPractical Workshops & Work Presentations
Hands-on Practical Exercises & Case Studies
Simulators (Hardware & Software) & Videos
In an unlikely event, the course instructor may modify the above training methodology for technical reasons.
VIRTUAL TRAINING (IF APPLICABLE)
If this course is delivered online as a Virtual Training, the following limitations will be applicable:
Certificates | : | Only soft copy certificates will be issued |
Training Materials | : | Only soft copy materials will be issued |
Training Methodology | : | 80% theory, 20% practical |
Training Program | : | 4 hours per day, from 09:30 to 13:30 |
RELATED COURSES

DE0378 : Subsurface Synthesis and Geomodelling Rules
- Date: May 12 - May 16 / 3 Days
- Location: Abu Dhabi, UAE
- Course Details Register

DE0315 : Uncertainties and Geo statistics
- Date: May 12 - May 16 / 3 Days
- Location: Abu Dhabi, UAE
- Course Details Register

DE1070-3D : Integrated Geomechanics in Exploration and Production
- Date: May 18 - May 20 / 3 Days
- Location: Abu Dhabi, UAE
- Course Details Register

DE1068-3D : Gas Condensate Fields Development
- Date: May 12 - May 14 / 3 Days
- Location: Abu Dhabi, UAE
- Course Details Register