COURSE OVERVIEW
DE0766 : Advance Drilling Optimization for HPHT Wells

OVERVIEW
COURSE TITLE | : | DE0766 : Advance Drilling Optimization for HPHT Wells |
COURSE DATE | : | May 04 - May 08 2025 |
DURATION | : | 5 Days |
INSTRUCTOR | : | Mr. Shehab Al-Hamoud |
VENUE | : | Doha, Qatar |
COURSE FEE | : | $ 8500 |
Register For Course Outline |
Course Description
This practical and highly-interactive course includes real-life case studies and exercises where participants will be engaged in a series of interactive small groups and class workshops.
This course is designed to provide participants with a detailed and up-to-date overview of HPHT drilling design and operational practices. It covers the HPHT drilling including its differences, essentials, project aims, objectives, challenges and associated standards and practices; the HPHT geological hazards, risk assessment on HPHT reservoirs geology in the HPHT environment and risk assessment; the aspect of HPHT reservoirs and well architecture specificities of HPHT wells; the casing design specific to HPHT; the OCTG choice, OCTG connector choice and surface equipment for HPHT wells; and the well equipment covering liner, wellheads and casing hangers.
Further, the course will also discuss the annulus management systems, subsea HPHT specificities and downhole equipment challenges; the casing wear, wellhead growth and fluids and cement aspects of HT environments; the kick tolerance modeling, hydraulic modeling in HPHT operations, logging, in-field drilling and rig inspection program; the equipment specific to HPHT, hydrates and HPHT checklists; and the HPHT procedures, HPHT coring, wireline logging, wellbore breathing, well control and ballooning.
During this highly interactive course, participants will learn the gas expansion, mud weight management, well control procedures and pressure drilling management; the fingerprinting connections, swab and surge, compressibility test, drain back/flow volume and contingency planning; and the well control emergencies and HPHT completions.
link to course overview PDF
TRAINING METHODOLOGY
This interactive training course includes the following training methodologies:
LecturesPractical Workshops & Work Presentations
Hands-on Practical Exercises & Case Studies
Simulators (Hardware & Software) & Videos
In an unlikely event, the course instructor may modify the above training methodology for technical reasons.
VIRTUAL TRAINING (IF APPLICABLE)
If this course is delivered online as a Virtual Training, the following limitations will be applicable:
Certificates | : | Only soft copy certificates will be issued |
Training Materials | : | Only soft copy materials will be issued |
Training Methodology | : | 80% theory, 20% practical |
Training Program | : | 4 hours per day, from 09:30 to 13:30 |
RELATED COURSES

DE0348 : Artificial Lift Systems
- Date: Apr 27 - May 01 / 3 Days
- Location: Doha, Qatar
- Course Details Register

DE0148 : Formation Damage, Remediation & Well Stimulation
- Date: Apr 27 - May 01 / 3 Days
- Location: Kuwait City, Kuwait
- Course Details Register

DE0295 : Coiled Tubing Well Intervention (Basic)
- Date: Apr 27 - May 01 / 3 Days
- Location: Muscat, Oman
- Course Details Register

DE0251(AD6) : Production Operations in the Oil & Gas Fields & Surface Facilities: Operation of Process Equipment, Separation of Oil/Gas/Water, Controlling Flow/Pressure/Temperature, Injection of Water/Gas & Process Troubleshooting
- Date: Apr 27 - May 01 / 3 Days
- Location: Doha, Qatar
- Course Details Register