HTME

COURSE OVERVIEW

PE0105 : Process Plant Optimization, Revamping & Debottlenecking
OVERVIEW
COURSE TITLE : PE0105 : Process Plant Optimization, Revamping & Debottlenecking
COURSE DATE : Nov 03 - Nov 07 2024
DURATION : 5 Days
INSTRUCTOR : Mr. Mervyn Frampton
VENUE : Dubai, UAE
COURSE FEE : $ 5500
Register For Course Outline
OTHER SCHEDULED DATES
Date : Feb 04 - Feb 08 (5 Days) Location : Dubai, UAE Classroom Fee (US$) : $ 5500 Course Info
Date : Mar 03 - Mar 07 (5 Days) Location : Doha, Qatar Classroom Fee (US$) : $ 6000 Course Info
Date : Jun 09 - Jun 13 (5 Days) Location : Dubai, UAE Classroom Fee (US$) : $ 5500 Course Info
Date : Sep 15 - Sep 19 (5 Days) Location : Doha, Qatar Classroom Fee (US$) : $ 6000 Course Info

Course Description

Process plants are normally designed to nameplate capacities stipulated at the commencement of design. However, this can be misleading. Usually, plants have an inbuilt design margin that is not 'visible' to the owner, leading to false operating constraints that cost you lost revenue. On the other hand, bottlenecks are often introduced due to poor design or as a result of incomplete commissioning and poor control. These tend to result in your facility having reduced throughputs coupled with poor uptime. Not too long ago, it was generally conceded that a new plant could produce at least 10% more than its nameplate capacity. In some instances, owners would oversize certain pieces of critical equipment to assure this and possibly more. Today, however, we see plants being expanded too much higher capacities due to a combination of new technology and improved ways to operate and control them.
Modernization and optimization are the key prerequisites for long-term successful plant operation. Process plants are subject to permanent adjustment pressure for optimization in the areas of new or changing feed materials, products and product specifications as well as environmental regulations and demands on energy savings. Major optimization targets are, in addition to cost cutting, plant quality and capacity improvements. Retrofitting a plant is often seen as an attractive investment option compared to a new plant. Implementing new technology ‘creeps’ the plant capabilities at minimum cost. Plant debottlenecking for incremental capacity or product quality changes costs less than a new plant. However, revamping plant is more complex than building new one. Existing equipment needs to be analyzed, performance predicted, and integrated with new equipment and process changes. Process sequence changes also require evaluation for finding the most cost effective and reliable revamp. Existing equipment poses both challenges and opportunities in a revamp. Challenges due to limitations, both hidden and obvious, must be met. Opportunities come from using underutilized capabilities of the existing equipment.
Correctly identifying both limits and opportunities provides the lowest investment revamp. Processes include more than just equipment. Processes include specific linkages between equipment to achieve the operating plant objectives. Revamps must examine both the capabilities of the equipment and the opportunities available from changing the process sequence (or operating conditions). Correctly integrating equipment and process evaluation requires good field test data, an accurate analysis of the data, and putting together a proper team for a given revamp. No revamp is the same as any other. Every plant is different. All equipment and every process have different limits and different opportunities.
Debottlenecking is a common term for increasing overall production capacity by identifying the limiting unit operation(s) in the process and removing this limitation. Like the weakest link in a chain, maximum production capacity of any process is limited by the lowest capacity step(s) in the process, thereby producing a "bottleneck" or narrowing of total process throughput. Identifying and eliminating "bottlenecks" is a cost-effective way to obtain a sometimes-significant increase in plant overall capacity and profitability. Debottlenecking can maximize an existing plant's profitability. However, debottlenecking considerations should be taken into account during the design stage of a new facility to allow for future debottlenecking. Also, sometimes a fresh view of an operating facility can lead to debottlenecking ideas. Both revamp work and troubleshooting can be part of a plant debottlenecking effort. They share many tactics, but differ in their intent. The goal of a revamp is to improve some basic parameters such as capacity or processing efficiency. In contrast, troubleshooting merely aims to solve a problem that hampers current operation. Often, the problem exposes an opportunity for much greater gain in performance. Both revamp and troubleshooting require open-minded thinking and proficiency with engineering tools. Both often rely on test runs to diagnose problems and uncover design errors or inaccuracies in equipment ratings. However, for a major improvement in the fundamental performance of a unit, the engineer must go beyond this first level of investigation and intentionally look for the greater gain..
This course is designed to provide a good overview of the process plant optimization, rehabilitation, revamping and debottlenecking. It covers process plant overview, optimization & profitability, basic and advanced optimization tools, optimizing the design, capacity creep & plant debottlenecking, cost-effective debottlenecking strategy and action plan, optimizing process operations, process controls, optimizing reliability, management & enterprise information systems, risk management & optimization, optimizing offsites operations, utilities management, rehabilitation philosophy and mechanism, revamping strategy and options, R&D role in new product development and production capacity enhancement, safety & environmental considerations, and project management issues. The course includes many case studies that will be discussed within the 5 days. However, participants are encouraged to bring their own problems and case studies to the course. These problems should be of a non-confidential nature that can be discussed without violation of any confidentiality restrictions.
link to course overview PDF

TRAINING METHODOLOGY

This interactive training course includes the following training methodologies as a percentage of the total tuition hours

Lectures
Workshops & Work Presentations
Case Studies & Practical Exercises
Videos, Software & Simulators

In an unlikely event, the course instructor may modify the above training methodology before or during the course for technical reasons.

VIRTUAL TRAINING (IF APPLICABLE)

If this course is delivered online as a Virtual Training, the following limitations will be applicable

Certificates: Only soft copy certificates will be issued to participants through Haward’s Portal. This includes Wallet Card Certificates if applicable
Training Materials: Only soft copy Training Materials (PDF format) will be issued to participant through the Virtual Training Platform
Training Methodology: 80% of the program will be theory and 20% will be practical sessions, exercises, case studies, simulators or videos
Training Program: The training will be for 4 hours per day starting at 09:30 and ending at 13:30
H-STK Smart Training Kit: Not Applicable
Hands-on Practical Workshops: Not Applicable
Site Visit: Not Applicable
Simulators: Only software simulators will be used in the virtual courses. Hardware simulators are not applicable and will not be used in Virtual Training

RELATED COURSES

Process Plant Optimization, Rehabilitation, Revamping & Debottlenecking

PE0105 : Process Plant Optimization, Rehabilitation, Revamping & Debottlenecking

Heat Exchangers & Fired Heaters

PE0382 : Heat Exchangers & Fired Heaters

Process Reactors: Operation, Troubleshooting, Start-Up & Shutdown

PE0055 : Process Reactors: Operation, Troubleshooting, Start-Up & Shutdown

De-Sulfurization Technology

PE0987 : De-Sulfurization Technology