COURSE OVERVIEW
DE0844 : Advanced Cementing and Completion Design & Operations
OVERVIEW
COURSE TITLE | : | DE0844 : Advanced Cementing and Completion Design & Operations |
COURSE DATE | : | Sep 23 - Sep 26 2024 |
DURATION | : | 4 Days |
INSTRUCTOR | : | Dr. Abdel Sattar Dahab |
VENUE | : | Abu Dhabi, UAE |
COURSE FEE | : | $ 6750 |
Request For Course Outline |
OTHER SCHEDULED DATES
Date | : | Mar 03 - Mar 07 (5 Days) | Location | : | Doha, Qatar | Classroom Fee (US$) | : | $ 8500 | Course Info |
Date | : | Jun 24 - Jun 27 (4 Days) | Location | : | Dubai, UAE | Classroom Fee (US$) | : | $ 6750 | Course Info |
Date | : | Sep 23 - Sep 26 (4 Days) | Location | : | Abu Dhabi, UAE | Classroom Fee (US$) | : | $ 6750 | Course Info |
Date | : | Dec 23 - Dec 26 (4 Days) | Location | : | Al Khobar, KSA | Classroom Fee (US$) | : | $ 6750 | Course Info |
Course Description
This course is designed to provide participants with a detailed and up-to-date overview of advanced cementing and completion design and operations. It covers the firm foundation in planning, designing, execution and evaluation for a successful cementation; the planning and design consideration covering the essential requirement for a successful primary and secondary cementation; the slurry design and rheology and well parameters to be considered for cementation; the preparation and execution of well successfully; the design and factors to be considered for cementing under loss situation and cementing of well with gas migration; the potential complication and remedies during cementation; and the critical cementation during planning and designing of linear, stage and horizontal well cementing.
Further, this course will also discuss the techniques of cement job and cement bond tool; the high performance light weight slurries, advancement and H.P.H.T cementing technology and equipment; the thermal cementing; the types and objective of completion operations according to reservoir and production data; the natural flow and artificial lift including single, dual gas lift and ESP well completion; the completion equipment, completion fluid and pressure test function; the main factors influencing completion design as well as well head valves types and applications; the overall approach to a well’s flow capacity; and the major types of completion configurations.
During this interactive course, participants will learn the main phases in completion and considerations, completion equipment, completion fluid, pressure test function, drilling and casing the pay zone; the perforating, treating the pay zone, the special case of horizontal wells, production wellhead and production string or tubing; the tubing specification as well as thread, grade, weight and material; the packers, downhole equipment, subsurface safety valves, running procedure, artificial lift and gas lift; the artificial lift process, completion management and artificial lift operations in open and cased holes; the designing and material selection for sweet and sour gas; the equipment and tender document evaluation; the main types of well servicing and workover, light well servicing, heavy servicing and workover operations on live wells; the servicing and workover operations on killed wells; the deviated, multiple zone, subsea, horizontal, multilateral and HPHT completion; and the well stimulation, hydraulic fracturing and acid stimulation.
link to course overview PDF
Further, this course will also discuss the techniques of cement job and cement bond tool; the high performance light weight slurries, advancement and H.P.H.T cementing technology and equipment; the thermal cementing; the types and objective of completion operations according to reservoir and production data; the natural flow and artificial lift including single, dual gas lift and ESP well completion; the completion equipment, completion fluid and pressure test function; the main factors influencing completion design as well as well head valves types and applications; the overall approach to a well’s flow capacity; and the major types of completion configurations.
During this interactive course, participants will learn the main phases in completion and considerations, completion equipment, completion fluid, pressure test function, drilling and casing the pay zone; the perforating, treating the pay zone, the special case of horizontal wells, production wellhead and production string or tubing; the tubing specification as well as thread, grade, weight and material; the packers, downhole equipment, subsurface safety valves, running procedure, artificial lift and gas lift; the artificial lift process, completion management and artificial lift operations in open and cased holes; the designing and material selection for sweet and sour gas; the equipment and tender document evaluation; the main types of well servicing and workover, light well servicing, heavy servicing and workover operations on live wells; the servicing and workover operations on killed wells; the deviated, multiple zone, subsea, horizontal, multilateral and HPHT completion; and the well stimulation, hydraulic fracturing and acid stimulation.
TRAINING METHODOLOGY
This interactive training course includes the following training methodologies:
LecturesWorkshops & Work Presentations
Case Studies & Practical Exercises
Videos, Software & Simulators
In an unlikely event, the course instructor may modify the above training methodology for technical reasons.
VIRTUAL TRAINING (IF APPLICABLE)
If this course is delivered online as a Virtual Training, the following limitations will be applicable:
Certificates | : | Only soft copy certificates will be issued |
Training Materials | : | Only soft copy materials will be issued |
Training Methodology | : | 80% theory, 20% practical |
Training Program | : | 4 hours per day, from 09:30 to 13:30 |
RELATED COURSES
DE0052 : ECLIPSE Blackoil Reservoir Simulation
- Date: Dec 08 - Dec 12 / 3 Days
- Location: Doha, Qatar
- Course Details Register
DE0393 : Production Operations 1
- Date: Dec 08 - Dec 12 / 3 Days
- Location: Doha, Qatar
- Course Details Register
DE0300 : Integration of Rocks, Log & Test data
- Date: Dec 08 - Dec 12 / 3 Days
- Location: Doha, Qatar
- Course Details Register
DE0100 : Workovers & Completions
- Date: Dec 08 - Dec 12 / 3 Days
- Location: Doha, Qatar
- Course Details Register