COURSE OVERVIEW
DE0170 : Pressure Transient Analysis and Practice
OVERVIEW
COURSE TITLE | : | DE0170 : Pressure Transient Analysis and Practice |
COURSE DATE | : | Dec 08 - Dec 12 2024 |
DURATION | : | 5 Days |
INSTRUCTOR | : | Mr. Jamal Khaled |
VENUE | : | Dubai, UAE |
COURSE FEE | : | $ 8000 |
Register For Course Outline |
OTHER SCHEDULED DATES
Date | : | Jul 01 - Jul 05 (5 Days) | Location | : | Abu Dhabi, UAE | Classroom Fee (US$) | : | $ 5500 | Course Info |
Date | : | Jul 15 - Jul 19 (5 Days) | Location | : | Abu Dhabi, UAE | Classroom Fee (US$) | : | $ 8000 | Course Info |
Date | : | Aug 04 - Aug 08 (5 Days) | Location | : | Dubai, UAE | Classroom Fee (US$) | : | $ 5500 | Course Info |
Date | : | Sep 16 - Sep 20 (5 Days) | Location | : | Abu Dhabi, UAE | Classroom Fee (US$) | : | $ 8000 | Course Info |
Date | : | Oct 20 - Oct 24 (5 Days) | Location | : | Dubai, UAE | Classroom Fee (US$) | : | $ 5500 | Course Info |
Date | : | Nov 03 - Nov 07 (5.0416666666667 Days) | Location | : | Dubai, UAE | Classroom Fee (US$) | : | $ 8000 | Course Info |
Date | : | Dec 09 - Dec 13 (5 Days) | Location | : | Abu Dhabi, UAE | Classroom Fee (US$) | : | $ 5500 | Course Info |
Course Description
The pressure transient test is one of the more important tools for evaluating reservoir performance. By measuring the change of pressure over time, pressure transient information is obtained. The method entails measuring flow rates and pressures under a range of flowing conditions and applying the data to a mathematical model. Fundamental data relating to the interval under test, such as reservoir height and details of the reservoir fluids, are also part of the input.
In many cases, wells and reservoirs were managed according to the data based on pressure transient tests. However, as the quality of information obtained from a pressure transient test depends, among other things, on the quality of the pressure and flow data, it is imperative to prevent inaccuracy in the pressure and flow measurements to assure integrity of data. At present, conventional pressure transient testing methods have been adapted in the petroleum industry. These methods provide useful general indicators of reservoir permeability, the flow capacity of the reservoir and any damage that may be restricting productivity.
The pressure transient test is one of the more important tools for evaluating reservoir performance. By measuring the change of pressure over time, pressure transient information is obtained. The method entails measuring flow rates and pressures under a range of flowing conditions and applying the data to a mathematical model. Fundamental data relating to the interval under test, such as reservoir height and details of the reservoir fluids, are also part of the input.
In many cases, wells and reservoirs were managed according to the data based on pressure transient tests. However, as the quality of information obtained from a pressure transient test depends, among other things, on the quality of the pressure and flow data, it is imperative to prevent inaccuracy in the pressure and flow measurements to assure integrity of data. At present, conventional pressure transient testing methods have been adapted in the petroleum industry. These methods provide useful general indicators of reservoir permeability, the flow capacity of the reservoir and any damage that may be restricting productivity.
link to course overview PDF
In many cases, wells and reservoirs were managed according to the data based on pressure transient tests. However, as the quality of information obtained from a pressure transient test depends, among other things, on the quality of the pressure and flow data, it is imperative to prevent inaccuracy in the pressure and flow measurements to assure integrity of data. At present, conventional pressure transient testing methods have been adapted in the petroleum industry. These methods provide useful general indicators of reservoir permeability, the flow capacity of the reservoir and any damage that may be restricting productivity.
The pressure transient test is one of the more important tools for evaluating reservoir performance. By measuring the change of pressure over time, pressure transient information is obtained. The method entails measuring flow rates and pressures under a range of flowing conditions and applying the data to a mathematical model. Fundamental data relating to the interval under test, such as reservoir height and details of the reservoir fluids, are also part of the input.
In many cases, wells and reservoirs were managed according to the data based on pressure transient tests. However, as the quality of information obtained from a pressure transient test depends, among other things, on the quality of the pressure and flow data, it is imperative to prevent inaccuracy in the pressure and flow measurements to assure integrity of data. At present, conventional pressure transient testing methods have been adapted in the petroleum industry. These methods provide useful general indicators of reservoir permeability, the flow capacity of the reservoir and any damage that may be restricting productivity.
TRAINING METHODOLOGY
This interactive training course includes the following training methodologies:
LecturesWorkshops & Work Presentations
Case Studies & Practical Exercises
Videos, Software & Simulators
In an unlikely event, the course instructor may modify the above training methodology for technical reasons.
VIRTUAL TRAINING (IF APPLICABLE)
If this course is delivered online as a Virtual Training, the following limitations will be applicable:
Certificates | : | Only soft copy certificates will be issued |
Training Materials | : | Only soft copy materials will be issued |
Training Methodology | : | 80% theory, 20% practical |
Training Program | : | 4 hours per day, from 09:30 to 13:30 |
RELATED COURSES
DE0611(KP4) : Basic Drilling
- Date: Nov 24 - Nov 28 / 3 Days
- Location: Doha, Qatar
- Course Details Register
DE0441(AD6) : Advanced PVT and EOS Fluid Characterization
- Date: Nov 24 - Nov 28 / 3 Days
- Location: Doha, Qatar
- Course Details Register
DE0392 : OLGA Flow Assurance
- Date: Nov 24 - Nov 28 / 3 Days
- Location: Doha, Qatar
- Course Details Register
DE0386 : Practical AVO and Seismic Inversion with Petrel
- Date: Nov 24 - Nov 28 / 3 Days
- Location: Doha, Qatar
- Course Details Register