COURSE OVERVIEW
DE0900 : Completion Design Practices and Perforation
OVERVIEW
COURSE TITLE | : | DE0900 : Completion Design Practices and Perforation |
COURSE DATE | : | Dec 09 - Dec 12 2024 |
DURATION | : | 4 Days |
INSTRUCTOR | : | Mr. Konstantin Zorbalas |
VENUE | : | Abu Dhabi, UAE |
COURSE FEE | : | $ 6750 |
Request For Course Outline |
OTHER SCHEDULED DATES
Date | : | Mar 04 - Mar 07 2024 (4 Days) | Location | : | Dubai, UAE | Classroom Fee (US$) | : | $ 6750 | Course Info |
Date | : | Jul 01 - Jul 04 2024 (4 Days) | Location | : | Al Khobar, KSA | Classroom Fee (US$) | : | $ 6750 | Course Info |
Date | : | Oct 13 - Oct 17 2024 (5 Days) | Location | : | Doha, Qatar | Classroom Fee (US$) | : | $ 8500 | Course Info |
Course Description
This practical and highly-interactive course includes real-life case studies where participants will be engaged in a series of interactive small groups and class workshops. This course is designed to provide participants with a detailed and up-to-date overview of completion design practices and perforation. It covers the basic well completion design, practices and strategies; developing a high level completion strategy for wells in a variety of situations; the packer selection and tubing forces; the selection of tubing, packers and completion flow control equipment; the wellheads/chokes/subsurface safety valves and flow control equipment; and the appraisal/designing a suitable flow barrier strategy and suitable intervention strategy. Further, this course will also discuss the recommendations on installation and retrieval practices for tubing, packers, etc. in different well types; the corrosion and erosion inflow and tubing performance; the tubing design, packer setting, retrieval and material selection; the key design features for horizontal, multilateral, HPHT wells, etc; the deviated/multiple zone/ subsea/horizontal/multilateral and HPHT completion considerations; the selection of an appropriate intervention strategy/equipment; and the key features/applicability of the main sand control, fracpack and well stimulation options
link to course overview PDFTRAINING METHODOLOGY
This interactive training course includes the following training methodologies:
LecturesWorkshops & Work Presentations
Case Studies & Practical Exercises
Videos, Software & Simulators
In an unlikely event, the course instructor may modify the above training methodology for technical reasons.
VIRTUAL TRAINING (IF APPLICABLE)
If this course is delivered online as a Virtual Training, the following limitations will be applicable:
Certificates | : | Only soft copy certificates will be issued |
Training Materials | : | Only soft copy materials will be issued |
Training Methodology | : | 80% theory, 20% practical |
Training Program | : | 4 hours per day, from 09:30 to 13:30 |
RELATED COURSES
DE0766 : Advance Drilling Optimization for HPHT Wells
- Date: Feb 02 - Feb 06 / 3 Days
- Location: Doha, Qatar
- Course Details Register
DE0409 : Field Development and Carbonate Reservoir
- Date: Feb 23 - Feb 27 / 3 Days
- Location: Doha, Qatar
- Course Details Register
DE0920 : Artificial Lift ESP Downhole Equipment
- Date: Jan 12 - Jan 16 / 3 Days
- Location: Istanbul, Turkey
- Course Details Register
DE0500 : Screening of Oil Reservoirs for Enhanced Oil Recovery
- Date: Jan 12 - Jan 16 / 3 Days
- Location: Dubai, UAE
- Course Details Register