HTME

COURSE OVERVIEW

DE0348 : Artificial Lift Systems
Artificial Lift Systems
OVERVIEW
COURSE TITLE : DE0348 : Artificial Lift Systems
COURSE DATE : Apr 21 - Apr 25 2024
DURATION : 5 Days
INSTRUCTOR : Mr. Konstantin Zorbalas
VENUE : Doha, Qatar
COURSE FEE : $ 8500
Request For Course
OTHER SCHEDULED DATES
Date : Mar 04 - Mar 07 2024 (4 Days) Location : Istanbul, Turkey Classroom Fee (US$) : $ 7250 Course Info
Date : Jun 03 - Jun 06 2024 (4 Days) Location : Dubai, UAE Classroom Fee (US$) : $ 6750 Course Info
Date : Sep 16 - Sep 19 2024 (4 Days) Location : Abu Dhabi, UAE Classroom Fee (US$) : $ 6750 Course Info
Date : Oct 13 - Oct 17 2024 (5 Days) Location : Doha, Qatar Classroom Fee (US$) : $ 8500 Course Info
Date : Nov 09 - Nov 13 2024 (5 Days) Location : Doha, Qatar Classroom Fee (US$) : $ 8500 Course Info
Date : Dec 16 - Dec 19 2024 (4 Days) Location : Al Khobar, KSA Classroom Fee (US$) : $ 6750 Course Info
Date : Apr 27 - May 01 2025 (5 Days) Location : Doha, Qatar Classroom Fee (US$) : $ 8500 Course Info
Date : Sep 21 - Sep 25 2025 (5 Days) Location : Doha, Qatar Classroom Fee (US$) : $ 8500 Course Info

Course Description

This practical and highly-interactive course includes real-life case studies and exercises where participants will be engaged in a series of interactive small groups and class workshops. Most of the world?s oil wells are placed on some kind of artificial lift, the most significant of which are suckerrod pumping, gas lifting, and electrical submersible pumping. Production engineers are required to design and operate these installations at their peak efficiencies so as to reach a maximum of profit. To achieve this goal, a perfect understanding of the design of the different lift methods, as well as working skills in the ways ensuring optimum production condition is necessary. This course first provides an overview of wellperformance evaluation leading to determination of well conditions necessitating application of artificial lift. The various types of artificial lift systems along with their selection criteria are then presented. The theoretical and practical aspects of the most important artificial lift methods will be covered, so that at the end of the course the participants will have a sound knowledge of the theory underlying each method as well as a abroad view of the relative advantages, disadvantages, niche of applications and limitations of each artificial lift system. The course integrates lectures with hands-on exercises. Participants of this course will work with software that allows them to design and analyze artificial lift designs, which will improve performance and results in higher production rates and/or reduced operating costs. Participants will also learn how to design and troubleshoot rod pumping, continuous gas lift and ESP systems.The course also covers other methods such as PCP, plunger lift, jet pump, hydraulic pump and intermittent gas lift. Participants are expected to gain experience in solving problems by hand and also by using advanced computer programs. Troubleshooting is an important part of artificial lift operations which will be illustrated in the course covering several typical surveillance problems to be solved.

TRAINING METHODOLOGY

This interactive training course includes the following training methodologies:

Lectures
Workshops & Work Presentations
Case Studies & Practical Exercises
Videos, Software & Simulators

In an unlikely event, the course instructor may modify the above training methodology for technical reasons.

VIRTUAL TRAINING (IF APPLICABLE)

If this course is delivered online as a Virtual Training, the following limitations will be applicable:

Certificates : Only soft copy certificates will be issued
Training Materials : Only soft copy materials will be issued
Training Methodology : 80% theory, 20% practical
Training Program : 4 hours per day, from 09:30 to 13:30

RELATED COURSES

Field Development and Carbonate Reservoir

DE0409 : Field Development and Carbonate Reservoir

Advance Drilling Optimization for HPHT Wells

DE0766 : Advance Drilling Optimization for HPHT Wells

Artificial Lift ESP Downhole Equipment

DE0920 : Artificial Lift ESP Downhole Equipment

Screening of Oil Reservoirs for Enhanced Oil Recovery

DE0500 : Screening of Oil Reservoirs for Enhanced Oil Recovery