COURSE OVERVIEW
DE0969 : Preparation for Drilling Site Location (Site Levelling, Excavating & Trenching; Conductor Hole, Rat Hole & Mouse Hole; Transporting Equipment, etc.)
OVERVIEW
COURSE TITLE | : | DE0969 : Preparation for Drilling Site Location (Site Levelling, Excavating & Trenching; Conductor Hole, Rat Hole & Mouse Hole; Transporting Equipment, etc.) |
COURSE DATE | : | May 06 - May 09 2024 |
DURATION | : | 4 Days |
INSTRUCTOR | : | Dr. Abla Rhouma |
VENUE | : | Al Khobar, KSA |
COURSE FEE | : | $ 6750 |
Request For Course |
OTHER SCHEDULED DATES
Date | : | Feb 05 - Feb 08 2024 (4 Days) | Location | : | Abu Dhabi, UAE | Classroom Fee (US$) | : | $ 6750 | Course Info |
Date | : | Aug 05 - Aug 08 2024 (4 Days) | Location | : | Doha, Qatar | Classroom Fee (US$) | : | $ 6500 | Course Info |
Date | : | Sep 29 - Oct 03 2024 (5 Days) | Location | : | Doha, Qatar | Classroom Fee (US$) | : | $ 8500 | Course Info |
Date | : | Nov 04 - Nov 07 2024 (4 Days) | Location | : | Dubai, UAE | Classroom Fee (US$) | : | $ 6750 | Course Info |
Course Description
This practical and highly-interactive course includes real-life case studies and exercises where participants will be engaged in a series of interactive small groups and class workshops. This course is designed to provide participants with a detailed and up-to-date overview of preparation for drilling site location; it covers the criteria for criteria for location. Selection, including a good well construction; the surface footprint; the geological prognosis on spotting; the well and rig selection to achieve the scope of work; the AFE preparation, economics and early mobilization of materials with long delivery. At the completion of the course, participants will be able to apply RP as per API specs for site preparation course permits, authorizations and safety regulations; level .the site using geotechnical survey and location survey; illustrate excavation; the trenching of conductor hole, rathole, mousehole; the hammer driving; recognize conductor pipe, transportation of equipment; the materials to location; identify drill pad, truck transportation, for unloading goods in position for rig; determine mud and tanks at drill site; rig on site rigging up all components, safety rules; substructures; associated equipment; and recognize potential hazards, rig floor and mast or derrick erection.
TRAINING METHODOLOGY
This interactive training course includes the following training methodologies:
LecturesWorkshops & Work Presentations
Case Studies & Practical Exercises
Videos, Software & Simulators
In an unlikely event, the course instructor may modify the above training methodology for technical reasons.
VIRTUAL TRAINING (IF APPLICABLE)
If this course is delivered online as a Virtual Training, the following limitations will be applicable:
Certificates | : | Only soft copy certificates will be issued |
Training Materials | : | Only soft copy materials will be issued |
Training Methodology | : | 80% theory, 20% practical |
Training Program | : | 4 hours per day, from 09:30 to 13:30 |
RELATED COURSES
DE0500 : Screening of Oil Reservoirs for Enhanced Oil Recovery
- Date: Jan 12 - Jan 16 / 3 Days
- Location: Dubai, UAE
- Course Details Register
DE0920 : Artificial Lift ESP Downhole Equipment
- Date: Jan 12 - Jan 16 / 3 Days
- Location: Istanbul, Turkey
- Course Details Register
DE0766 : Advance Drilling Optimization for HPHT Wells
- Date: Feb 02 - Feb 06 / 3 Days
- Location: Doha, Qatar
- Course Details Register
DE0409 : Field Development and Carbonate Reservoir
- Date: Feb 23 - Feb 27 / 3 Days
- Location: Doha, Qatar
- Course Details Register