HTME

COURSE OVERVIEW

DE0159 : Horizontal and Multilateral Wells: Completions and Stimulation
Horizontal and Multilateral Wells: Completions and Stimulation
OVERVIEW
COURSE TITLE : DE0159 : Horizontal and Multilateral Wells: Completions and Stimulation
COURSE DATE : Mar 04 - Mar 07 2024
DURATION : 4 Days
INSTRUCTOR : Dr. Chris Kapetan
VENUE : Dubai, UAE
COURSE FEE : $ 6750
Request For Course

Course Description

This practical and highly-interactive course includes real-life case studies and exercises where participants will be engaged in a series of interactive small groups and class workshops. Recent Advances in drilling and completion have resulted in a rapid increase in the number of horizontal and multilateral wells drilled each year around the world. A horizontal well, to some extent, is different from a vertical well because it requires an interdisciplinary interaction between various professionals, such as geologists, reservoir engineers, drilling engineers, production engineers, and completion engineers. A typical horizontal well project is different from a vertical well project because productivity of a well depends upon the well length. Moreover, the well length depends upon the drilling and completion techniques implemented. Multilateral well technology is revolutionizing the way that reservoirs are accessed by wells. The ability to create wells with multiple branches that can target widely spaced reservoir compartments provides engineers unlimited options in optimizing economic extraction of oil and gas. Along with this opportunity comes the inherent complexity of these well architectures.The course also analyzes the successes and failures of well integrity management from a series of real case studies in the oilfield and production facilities around the globe. During the course, the participants will review and discuss the requirements of operators and regulatory authorities for integrity assurance in wells and production facilities. They will also gain knowledge in the completion techniques and design of wells in increasingly complex field developments to ensure well integrity, failure-free and long-life production.

TRAINING METHODOLOGY

This interactive training course includes the following training methodologies:

Lectures
Workshops & Work Presentations
Case Studies & Practical Exercises
Videos, Software & Simulators

In an unlikely event, the course instructor may modify the above training methodology for technical reasons.

VIRTUAL TRAINING (IF APPLICABLE)

If this course is delivered online as a Virtual Training, the following limitations will be applicable:

Certificates : Only soft copy certificates will be issued
Training Materials : Only soft copy materials will be issued
Training Methodology : 80% theory, 20% practical
Training Program : 4 hours per day, from 09:30 to 13:30

RELATED COURSES

Advance Drilling Optimization for HPHT Wells

DE0766 : Advance Drilling Optimization for HPHT Wells

Petrel Workflow Editor & Uncertainty Analysis

DE1056 : Petrel Workflow Editor & Uncertainty Analysis

Drilling Problems and Drilling Optimization

DE0448 : Drilling Problems and Drilling Optimization

PTA/RTA Foundation

DE0171 : PTA/RTA Foundation